Why the same hall can differ in price several times over

When a client asks “how much does an immersive hall cost?”, the honest answer is “it depends”. Two halls of the same size can differ in budget several times over, and it’s not about the contractor’s appetite. The price is driven by decisions made before any estimate: which surfaces are used, how much content there will be, how long the hall will operate.

To make the budget conversation concrete, it helps to understand what it consists of. Below are the six cost items found in any immersive project and the factors that change the total the most.

6 budget items for an immersive hall

[секции]

What affects the price most

  • Number of surfaces. Walls only, walls and floor, or a full cube with ceiling — each surface adds equipment and content.
  • Amount of original content. A minute of original 3D animation in the hall’s format is one of the most expensive items.
  • Interactivity. Responding to movement and touch requires sensors, programming and testing.
  • Operating period. A permanent hall needs a different class of equipment than a temporary installation.
  • Condition of the space. Blackout, surface finishing, electrics and ventilation sometimes cost as much as the equipment.

How to save without losing impact

  • Start with fewer surfaces. Walls and floor give strong immersion without the cost of the ceiling.
  • Build the programme from scenes. Several short scenes can be updated one at a time instead of remaking the whole film.
  • Rent equipment for temporary projects. Buying makes sense if the hall runs for a year or more.
  • Plan content reuse from the start for social media, exhibitions and advertising.
  • Involve the contractor during renovation. It’s easier to plan electrics, mounts and blackout without rework.

How to request an accurate estimate

  1. Send the floor plan, dimensions and ceiling height.
  2. Describe the purpose of the hall and the audience.
  3. Specify which surfaces you want to use.
  4. Define the programme length and whether interactivity is needed.
  5. State the operating period and a budget guideline.

If you’re planning an immersive space, see our projects in immersive spaces — we’ll help estimate the budget for your task.

1. Concept and scenario

The idea of the hall, dramaturgy, storyboard and technical concept: which surfaces, what light and sound, how the viewer moves. It’s a relatively small part of the budget, but it determines everything else. A mistake at this stage is the most expensive, because it has to be fixed later in equipment and content.

2. Projection or LED equipment

The most visible item. The number of projectors depends on surface area, ceiling height and required brightness: a large hall may need ten or more devices blended into one image. LED surfaces cost more upfront but don’t require blackout and depend less on the room’s geometry.

3. Media servers and software

Computers and software that play content in sync across all surfaces, blend multiple projectors and control scenes. For interactive halls, add motion sensors, cameras and logic programming. Saving here is risky: system stability depends on it.

4. Sound and light

Immersion is not only about the picture. Multichannel sound that “moves” around the hall with the image and well-designed lighting at entry and exit greatly strengthen the experience. This item is often underestimated at the start and added at the last moment when the budget is already allocated.

5. Content

Creating video for the hall’s format: 3D animation, compositing, adaptation to the geometry and resolution of every surface. Cost depends on running time, graphic complexity and the number of scenes. In long-running projects this is often the largest item, especially if the programme is updated regularly.

6. Installation, set-up and operation

Structures and mounts, cabling, projector calibration, image blending, test runs. After launch — maintenance, spare parts, support and content updates. For a permanent hall these costs should be calculated several years ahead, not just for opening day.